Converting Existing Space Into a High-Tech Suite

UnityPoint Health Methodist : Peoria, Illinois

PROJECT SIZE & COST

3,100 square feet | $1.4 million

THE CHALLENGE

To meet growing demand for less-invasive procedures to diagnose and treat diseases, the hospital decided to convert an existing space into a new interventional radiology suite. The design included a large medical equipment room with tight environmental requirements.

 

KED SOLUTION

We designed a dedicated cooling system for the medical equipment room to ensure safe conditions for the suite’s expensive technology. We also coordinated directly with the equipment vendor on all power, data and communication systems designs. Other improvements included installation of new plumbing fixtures, medical gas and replacement of existing fire protection equipment, as well as upgrades to lighting, heating and cooling, and power systems.

ENGINEERING SERVICES PROVIDED
  • Communications
  • Electrical distribution
  • Fire protection
  • Heating
  • Lighting
  • Plumbing
  • Ventilation
CLIENT CONTACTS

Ed Madden

Construction Specialist

309 / 672.4252

Healthcare