Modernizing Natural Fiber Welding’s Chilled Water System

Natural Fiber Welding : Peoria, Illinois

PROJECT SIZE & COST

100,000 square feet | $1,079,480

THE CHALLENGE
Natural Fiber Welding needed to upgrade their chilled water system, as it is a crucial component to their manufacturing process. The chilled water system continuously cools the manufacturing equipment, preventing the equipment from overheating. With the upgrade, the client also wanted to allow for additional capacity abilities in the future. Our design included increasing electrical capacity by any required changes electrically.

 

KED SOLUTION : Upgrading to Meet All Current and Future Needs
KED centralized the chilled water system, updating all necessary piping and equipment. We added two, state-of-the-art, highly efficient chillers for maximum chilling capacity. We increased the electrical system and provided spare capacity for future growth. As a result, Natural Fiber Welding’s chilled water system is updated, consolidated, and equipped for any capacity abilities they might need in the future.

ENGINEERING SERVICES PROVIDED
  • Electrical
  • Electrical Distribution
  • Heating
  • Mechanical
  • Process Piping
  • Temperature Controls