Modernizing Science Labs for Safe, Effective Learning

Illinois Central College Biology & Chemistry Labs : East Peoria, Illinois

PROJECT SIZE & COST

2,084 square feet | $447,500

THE CHALLENGE
After 20 years of use, the college’s biology and chemistry labs needed major upgrades to accommodate the way today’s students learn. Working within the existing structure required careful coordination to avoid penetrating structural beams. Coordination with both the school and the architect was essential to meet the extremely tight summer construction schedule.

 

KED SOLUTION : Specialized Exhaust, Electrical & Piping Systems
In the biology lab, we installed a single-point exhaust system over the demonstration area, with sound-deadening insulation connections to mitigate noise distractions. In addition to upgrading the existing local branch panel, we designed a new isolated power branch panel that provides a grounding pathway to protect sensitive lab equipment. We also added acid waste piping to new sinks and reworked natural gas lines with emergency solenoid shut-off valves for safety. In the chemistry lab, updates included the addition of an exhaust fan and fume hoods.

ENGINEERING SERVICES PROVIDED
  • Communications
  • Electrical
  • Mechanical
  • Plumbing
  • Technology Integration
CLIENT CONTACTS

Tom Braun

Facilities Manager

309 / 694.8494

Education

ICC_BioChem_Main 1200
ICC_BioChem_1_600
ICC_BioChem_2_600