Assessing High Humidity Levels

Illinois Wesleyan University – Buck Memorial Library : Bloomington, Illinois

THE CHALLENGE

High humidity levels in the library were making the space uncomfortable and potentially promoting the formation of mold and mildew — prompting the university to request a study.

 

KED SOLUTION

Our assessment of the HVAC systems and fan coil unit uncovered a number of problems. Certain units had excess capacity while others were deficient due to an imbalance between water and air. Exhaust systems also were removing excessive amounts of air, causing the building to operate in a negative pressure condition. In addition, the unit responsible for bringing air into the building was undersized. We recommended installing an appropriate sized air handling unit to meet needed capacity, replacing the fan coil units and integrating a direct digital control for facility operators.

ENGINEERING SERVICES PROVIDED
  • Electrical distribution
  • Heating
  • Temperature controls
  • Ventilation
CLIENT CONTACTS

Jim Blumberg

Director of Facilities

309 / 556.3066

Troy Steidinger

Project Manager

309 / 556.1000

Education

IWU_Buck_Main_600
IWU_Buck1_600
IWU_Buck2_600