Showcasing a Hospital’s New Front Door

UnityPoint Health Methodist : Peoria, Illinois

PROJECT SIZE & COST

17,700 square feet | $5.7 million

THE CHALLENGE

Demolition of a parking deck on UnityPoint Methodist’s downtown campus created the opportunity for a new outpatient surgery entryway with easier access for the helipad landing. The owners concept included a grand entrance design, and improving patient safety was a key focus.

 

KED SOLUTION

To reduce costs, we incorporated the parking deck’s existing stair and elevator tower into the new entrance. The renovation also included a new smoke evacuation system to protect the three-story atrium, a new helipad including lighting and coordination with flight paths, and a snow-melt system to decrease snow removal efforts and improve patient safety. Installation of IP cameras connected to a central recording system increased patient and employee security, and the addition of dual electric car charging stations encouraged the use of energy-efficient cars.

ENGINEERING SERVICES PROVIDED
  • Data
  • Electrical distribution
  • Fire protection
  • Heating
  • Plumbing
CLIENT CONTACTS

Ed Madden

Construction Specialist

309 / 672.4252

Healthcare

UPMeth_SurgEntryMain_600
UPMeth_SurgEntry1_600
UPMeth_SurgEntry2_600